Brighton Marina

The procurement, installation and commissioning of all building services to 195 high-specification apartments, seven retail units and a three-storey basement car park.
Ark delivered the complete MEP package, which included a dedicated energy centre that housed combined heat and power, gas boilers and pumps. Modularisation of pipework was maximised for the distribution and energy centre.
Photovoltaic system was installed on the roof to take advantage of the location by the sea front to provide solar energy.

  • Date

  • 2016/2016

  • Location

  • Brighton

  • Value

  • £12m

Brighton Marina

The procurement, installation and commissioning of all building services to 195 high-specification apartments, seven retail units and a three-storey basement car park.

Ark delivered the complete MEP package, which included a dedicated energy centre that housed combined heat and power, gas boilers and pumps. Modularisation of pipework was maximised for the distribution and energy centre.

Photovoltaic system was installed on the roof to take advantage of the location by the sea front to provide solar energy.

The contract included all lighting to the bars, restaurants and retail units around the marina edge. In addition, the full M&E fit-out to the adjacent RNLI visitor centre and yacht club.

An extensive value engineering process was undertaken, allowing the client to meet their budget, while also retaining the performance specification.

Mechanical & Electrical